The actual letter sent to the man, DeVries, Ryan Michigan Department of environmental quality, the State of Michigan.
Mr. Ryan DeVries
2088 Dagget Pierson
MI 49339
SUBJECT: DEQ file No. 97-59-0023;
T11N; R10W, Sec. 20;
Montcalm County, Ohio
Sir DeVries:
It has come to the attention of the Department of the environment to the quality of the property on the parcel has been referenced above recent unauthorized operation. you have been certified legal maanomistaja and/or contractor who has been following unauthorized activities:
Construction and maintenance of two wood debris dams throughout the outlet on the spring Pond.The authorisation shall be granted before the beginning of such activities. The Department review of files indicates that there is no authorization has been granted. therefore, the Department has determined that this action is part of the 301, Inland lakes and Natural resources and the environmental protection Act 451 Public in accordance with the laws of Michigan compiled laws currently being in 1994, rekisteröimättömälle parts 324.30101 324.30113 streams in breach of the rules.
The Department has notified the other or both of the dams in part had failed during the recent rain event cause debris and flooding downstream places. we find that these dams are inherently dangerous and cannot be tolerated. The Department orders, and ruodussa all actions in this place and to restore the power free flow condition, delete all of the wood, and constitute the stream channel dams brush. All restoration work shall be completed no later than 31 January 2002.
Tell me this post when the restore is done so that the monitoring site inspection may be scheduled hotel staff to comply with this request or. continue the operation of the site may result in unauthorized in this case, was extended for the preparation of draft implementing measures.
We anticipate and appreciate your cooperation in this matter. Please feel free to contact me here at the Office, if you have any questions.
Sincerely, David l. price
As the representative of the land and water Division
Scope of management
This is the actual response is sent back to-
Dear Mr. price,
Re: DEQ file No. 97-59-0023;
T11N; R10W, Sec. 20;
Montcalm County, Ohio
Dated 12/17/97 certified letter has been released for me to reply to.
First of all, Mr. Ryan DeVries has no legal maanomistaja and/or 2088 Dagget, Pierson, Michigan, a Contracting Party.I am a legal owner and a couple of beavers are constructing and maintaining two wood "residuals" dams in my spring Pond outlet stream (State unauthorized) process.
When I do not have to be paid, nor allow to control the dam project, I believe that they would be very offended, skillful use of natural building materials you can call the "debris."
I would like to try to emulate their dam Department project always challenge and/or double-clicked. I think I can safely be mentioned there is no way, can never match their skills, their dam dam resourcefulness, ingenuity, dam dam persistence, firm and dam dam job worrying.
Your request I do not think beavers are aware that they must first fill dam, prior to the beginning of such an activity in the dam.
It is your own dam to you: (1) are my spring Pond Beavers to discriminate against or (2) whether you will need all beavers, throughout the State to comply with the request of the said dam?
If you are not without these, in particular through the freedom of Information Act beavers requests all of these other authorisations, applicable to the beaver Dam which have undergone copies. May we see if the dam is in breach of section 301, Inland lakes and streams, Natural resources and environmental protection act, is actually a rekisteröimättömälle Act 451 Public in accordance with the laws of Michigan compiled laws currently being in 1994, 324.30101 324.30113 points.
I have several issues. my first – are not beavers have the right to legal representative? Spring Pond Beavers are economically varattomat and able to pay of the representation – so the State shall be supplied by the dam, acting as agent, assisted by the Department to have failed in its obligation to the other or both of the dam of tailings dams cause floods during the recent rain event is proof that this is a natural occurrence, which is to protect the title.
In other words, we should leave the spring Pond Beavers alone, on the other hand, they interfere with and calling the names of the dam.
If you want to ' return to ' free flow condition dam power Contact beavers – but if you plan to retain them, they apparently did not pay any attention to my letter from the dam can not read English.
Spring Pond Beavers have the right to prevent unauthorized dams built, as long as the sky is blue, the grass is green and water flows downstream lowly I think. they have more rights than the dam to live and enjoy the spring Pond. Department of the environment and natural resources if you live in the name, it should (beavers) natural resources and protection of the environment (beavers ' dams.).
So dam beavers and case may refer the matter to the more extended right now for the preparation of draft implementing measures for. why until 1/31/2002? Spring Pond dam Beavers can then be ice, and not in any way you or dam HR contact/harass them.
In conclusion, I would like to import the actual quality of the environment (health) in the field of attention, the problem is to include It.! bears our forests actually defecating. I think you should persecute defecating lens, and leave the beavers solo definitely. If you are going to examine the beaver Dam, watch your step!(To do be careful if the image!)
Currently can comply with the request to the dam and is unable to reach you in case we have any dam answering machine, I am dam send this reply to the Office.
No comments:
Post a Comment